Expansion and renovation of Helsinki Airport Terminal 2

Kohteen tiedot

LaajuusThe total scope of the project is 75,000 m²
Valmistuminen1.12.2021
SijaintiHelsinki Airport in Vantaa

The expansion and renovation of Terminal 2 strengthen Helsinki Airport’s position as a key hub for air traffic between Europe and Asia, while providing passengers with a seamless and convenient travel experience.

Alliance project model behind the successConstruction site of the year 2021The total scope of the project is 75,000 m²

SRV carried out a transformation project at Helsinki Airport using an alliance model, enabling smoother customer service and improved global traffic flow. The project was implemented partly as new construction and partly through the renovation of existing structures.

The extension completed in front of Terminal 2 creates a new type of area serving air passengers. The terminal now features a new check-in area, security screening, baggage claim and arrivals hall. The expansion also includes a travel centre connecting different modes of transport.

Lentokentän terminaali kuvattu pimeällä ulkoapäin. Terminaalista kajastaa valoa.
Kuva: Marc Goodwin

The total area of the new building and renovated sections amounted to 75,000 square metres, of which the extension covered 40,000 square metres. During the construction of Terminal 2, environmental sustainability was given particular emphasis. The project successfully combined a smooth and straightforward passenger experience with strong environmental values.

The key strengths of the project included success in delivering a demanding and complex scheme, meeting all the goals set for the alliance, and achieving excellent collaboration within the alliance. The inspiring and successful journey from design to completion was a valuable learning process that produced meaningful results.

Lentokentän puurakenteita kuvattuna alaviistosta. Valo säteilee kattoikkunoista.
Kuva: Tuomas Uusheimo

The Helsinki Airport Terminal project has received numerous national and international awards, including:

  • Construction Site of the Year 2021 by Rakennuslehti
  • Steel Structure of the Year 2021
  • Winner of the Tekla BIM Awards 2021 for Finland and the Baltic countries
  • Winner of the Tekla Global BIM Awards 2022
  • European Steel Design Award 2023

The project, which utilised the Lean construction model, enables a smooth and seamless departure experience for passengers and was also a rewarding collaboration for all parties involved in this major public building project. Terminal 2 opened to passengers on 1 December 2021.

View our references

Valkoisia sairaalarakennuksia kuvattuna ulkoapäin kesällä

Meilahti Bridge Hospital in Helsinki

Wintteri ilmakuva

Wintteri – a lifecycle-wise multipurpose centre combining education, sports and wellbeing

Lentokentän terminaali ulkoa kuvattuna tunnelmavalaistuksessa.

Expansion and renovation of Helsinki Airport Terminal 2

Nokia Arenan jäähalli

Explore our construction services

Our services include housing, business premises, infrastructure construction, energy and lifecycle services, as well as technical building services.

Learn more about our services and get in touch